more products
Factory Show
- Factory Introduction
- production equipment
- Product Professional Testing Center
- Light storage green intelligent house expansion box
- Warehouse production product display
- Solar energy storage green smart house
- Green smart house space capsule
- Green Smart House Apple Cabin
- Green Smart House - Portable Prefabricated House
- Pack the boxes, load the truck, and ship the goods
- Packaging box integrated housing workshop welding production
- Introduction to the framework of integrated housing with packing boxes
- Energy storage power station
- Packaging box mobile house
- Double wing expansion box
- Household storage system
- Apple Cabin Mobile House
- Space capsule mobile house
- Activity board houses
- energy storage battery
- Installation of packaging box circuit
- Double wing expansion box
- Packing Box Activity Room
- commercial and industrial energy storage
- Home light storage system2·0
- inverter
- Integrated house folding box fireproof lock handle door
- Packaging box integrated with the top frame of the house
- Packing room, container loading and shipping
- Packaging box room photovoltaic installation
- Packing box integrated room
- Folding packing box
- Energy storage cabinet
- Double wing expansion box
- Integrated house delivery
- Light storage green intelligent house Apple cabin
- Integrated housing spacecraft
- Mobile home factory production
- Integrated house packaging box source factory visit
- Container loading and shipment for export abroad
- In-plant frame packaging of temporary integrated housing units, shipped in bulk
- Solar photovoltaic panels, integrated housing packaging boxes, energy storage systems, light storage green smart houses, movable houses
- Xinguangda Integrated Housing - Source Manufacturer of Modular Housing
- modular houses
- energy storage systems
- DC-AV inverter
- Welding operation in temporary modular factory
- The integrated housing Apple Cabin
- Integrated housing space capsule
- Insulation at the bottom of integrated housing
- Houses of various colors
Products
Featured Products
Contact Details
Integrated house folding box fireproof lock handle door
Before installation, two key preparations need to be completed: first, a size review of the reserved opening for the packaging box to ensure that the deviation from the door and window specifications is controlled within ± 2mm, and at the same time, cleaning up debris around the opening and leveling the connection surface; The second is to check the integrity of door and window components, with a focus on verifying whether the frame, glass, hardware (hinges, locks, etc.) match, and whether the sealing strip is intact.
The core installation process is divided into three steps: first, fix the door and window frames at the preset points of the opening with expansion bolts or special connectors, ensuring that the vertical and horizontal deviations of the frame do not exceed 1mm/m; Secondly, install glass and door panels, adjust hardware components to ensure smooth opening and closing, and even gaps; Finally, fill the joint between the frame and the opening with waterproof sealant, and install decorative pressure strips on the outside to enhance waterproofing and aesthetics.
The core installation process is divided into three steps: first, fix the door and window frames at the preset points of the opening with expansion bolts or special connectors, ensuring that the vertical and horizontal deviations of the frame do not exceed 1mm/m; Secondly, install glass and door panels, adjust hardware components to ensure smooth opening and closing, and even gaps; Finally, fill the joint between the frame and the opening with waterproof sealant, and install decorative pressure strips on the outside to enhance waterproofing and aesthetics.
The installation process must strictly follow two standards: first, structural stability, with a spacing of no more than 600mm between connectors to ensure that the wind pressure resistance performance of doors and windows meets the standard; The second is the sealing waterproof performance, which needs to be tested with water after completion, and can only be accepted if there is no leakage. The overall installation cycle is short, and a single door and window can be completed in about 1-2 hours. It is also detachable and reusable, which is in line with the green and efficient construction concept of integrated houses.


Get the latest price? We'll respond as soon as possible(within 12 hours)




